
By Lehi Thomas, Co-Founder of Swift WMS
Key takeaways
- Pick a lot that tests you. Choose one received weeks ago, split across pallets, used in several batches, or shipped to more than one customer. Alternate forward and backward traces.
- Trace the lot both ways, then make the numbers close. Every unit received has to land in a bucket: on hand, consumed, scrapped, returned, or shipped. An unexplained gap is the most valuable thing a drill can produce.
- Score the drill and assign every gap an owner and a date. Check time, completeness, mass balance, customer contacts, and whether both traces match. Run one at least yearly, and change the scenario each time.
Most small plants believe they can trace a lot. A mock recall is how you find out. It is a planned practice run of a real recall: you pick a lot, follow it through your records, account for every unit, and work out who you would need to call. Nothing leaves the building and no customer gets a real notice.
Use the drill to find the gaps in your records while finding them is cheap. A drill that finds nothing usually means the test was too easy. Here is one built for a small team, where one person often wears two or three hats.
1. Pick a lot that will actually test you
The easiest lot to trace is a finished lot made yesterday from one ingredient, sitting in one place. It proves almost nothing.
Good test lots have some of these traits:
- An ingredient lot received weeks or months ago.
- A lot that was split across several pallets or containers.
- A lot used in more than one batch, or across more than one product.
- A lot that went into rework.
- Finished goods shipped to more than one customer.
Alternate the direction from one drill to the next. A forward trace starts from an input and asks, “Where did it go?” A backward trace starts from a finished lot and asks, “What went into it?” Each direction tests different records, and a real event usually needs both.
2. Write the scenario and the target time first
Write one or two sentences before you start. For example: “Our supplier says lot 4471 of cocoa powder may contain an undeclared allergen. Find every batch, finished lot, and shipment that contains it.”
Then agree on a target time with your quality lead and your customers’ expectations in mind. There is no single number that fits every business, and schemes and customer agreements differ, so check what yours ask for. Start the clock when the scenario is announced, not when the team is ready.
3. Give every role a name
A recall touches the whole operation, so the drill should too. In a small plant, write down who covers each role, even when one person covers two:
- Coordinator: runs the clock, keeps notes, and keeps the steps moving.
- Receiving or warehouse: finds the receiving record and every container still in the building.
- Production: finds every batch that used the lot and every finished lot it became.
- Shipping or customer service: finds every shipment and customer contact.
- A manager with authority: decides on holds and signs off.
If one person covers every role, the drill tests that person’s memory. Run at least one drill a year when your key people are out.
4. Run the trace both ways
Start at receiving. Find when the lot arrived, from whom, how much, and where it went. Pull the supplier’s certificate of analysis for that lot if you keep one.
Then follow it into production. List each batch that used it and how much each one consumed. List each finished lot those batches made. Then list each shipment of those finished lots, with the customer, the date, and the quantity.
Finish with a cross-check in the other direction. Take one of the finished lots you found and confirm its batch record names the original ingredient lot. If the two directions disagree, you have found your first gap.
5. Make the numbers close
Finding where a lot went is half the job. The other half is proving the quantities add up. This is the mass balance, and it is where most drills uncover their real problems.
Every unit received should land in one bucket:
- Still on hand, with its location.
- Consumed into a batch, with the batch and the quantity.
- Scrapped, sampled, or adjusted, with the reason.
- Returned to the supplier.
- Shipped inside finished goods, with the customer and the quantity.
Do the same for each finished lot: made, on hand, shipped, and anything scrapped or held back as samples.
Then walk the floor. A record that says two pallets sit in a rack location is only a claim until someone looks. If the buckets do not add up, write down the gap and the reason, or write that you could not find one. An unexplained gap is the most valuable thing a mock recall can produce.
Decide before the drill whether you will place real holds. In a real event you hold every affected lot right away. In a drill, a real hold can block a real shipment. Either is fine, as long as the team agrees in advance.
6. Test the phone list without scaring anyone
You do not want a customer to receive a fake recall notice by mistake. You do want proof that you could reach every affected customer quickly.
- List each customer who received affected product, with dates and quantities.
- Find a named contact, a phone number, and an email for each one.
- Check that each contact is current. A contact nobody has confirmed this year counts as a gap.
- Draft the notice you would send: product, lot, quantity, and what you need the customer to do.
- If a customer agrees ahead of time, send a clearly marked test message and time the reply.
Co-packers have one more question to settle: who calls whom first when the product carries someone else’s brand. Write that order down with each brand owner before the drill, not during a real event.
7. Score it honestly and fix what it finds
Stop the clock when the team can show the full trace, the closed mass balance, and the customer list. Then score against the scenario:
| Check | Question |
|---|---|
| Time | Did you finish inside the target you agreed? |
| Completeness | Did you find every batch, finished lot, and shipment? |
| Mass balance | Did the units add up, and is every gap explained? |
| Contacts | Is there a current contact for every affected customer? |
| Agreement | Did the forward and backward traces match? |
Write a one-page report: scenario, team, times, findings, and score. File it with your quality records.
Every gap needs an owner and a date. A lot number missed at the dock is a receiving fix. A batch sheet with a copied number is a production fix. A stale phone number is a customer service fix. Check each fix in the next drill.
How often to run one
A yearly drill is a common starting point, with an extra one after a big change such as a new product line, building, or records system. Some customers set the frequency in their quality agreements, so confirm what yours expect.
Change the scenario every time: rotate directions, product lines, shifts, and people. Over a few years, the drills stop finding big gaps and start finding small ones. That is what progress looks like.
Lehi Thomas is the founder of Swift WMS, a small team in Payson, Utah that builds warehouse and production software for small manufacturers, co-packers, and food and CPG plants. He spends his time with plant teams on the less than glamorous parts of food safety: how stock is received, how lots are labeled and moved, and how fast a plant can answer a recall question.



